Pangjiangjie station
Appearance
Pangjiangjie 滂江街 | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||
Location | Intersection of Panjiang St. and Zhulin Rd. Dadong District, Shenyang China | |||||||||||||||
Coordinates | 41°48′32″N 123°29′18″E / 41.808983°N 123.488328°E | |||||||||||||||
Operated by | Shenyang Metro | |||||||||||||||
Line(s) | Line 1 Line 10 | |||||||||||||||
Platforms | 4 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Underground | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Station code | L1/02 | |||||||||||||||
History | ||||||||||||||||
Opened | 27 September 2010 29 April 2020 (line 10) | (line 1)|||||||||||||||
Services | ||||||||||||||||
|
Panjiangjie (Chinese: 滂江街站; pinyin: Pāngjiāngjiē Zhàn) is an interchange station on lines 1 and 10 of the Shenyang Metro.[1] The line 1 station opened on 27 September 2010,[2] and the line 10 station opened on 29 April 2020.[3]
Station Layout
[edit]G | Line 1 concourse | Exits A-H, Faregates, Station Agent |
B1 | Line 10 Concourse | Faregates, Station Agent |
M | Interchange corridor | |
B2 | Westbound | ← Line 1 towards Shisanhaojie (Dongzhongjie) |
Island platform, doors open on the left | ||
Eastbound | Line 1 towards Limingguangchang (Terminus) → | |
Northbound | ← Line 10 towards Dingxianghu (Dongbeidamalu) | |
Island platform, doors open on the left | ||
Southbound | Line 10 towards Zhangshabu (Chang'anlu) → |
References
[edit]- ^ "沈阳地铁线网图". Shenyang Metro. Retrieved 12 October 2020.
- ^ "沈阳地铁集团有限公司运营分公司". Shenyang Metro. Retrieved 12 October 2020.
- ^ "沈阳地铁十号线一期工程定于4月29日开通运营". Shenyang Metro. Retrieved 13 October 2020.